on 12 Feb 2025
Last Applicant/ Owned by
Cathay Pacific Airways Limited
8/F, North Tower, Cathay Pacific City8 Scenic RoadHong Kong International AirportLantau,
HK
Serial Number
2169561 filed on 1st Mar 2022
Correspondent Address
BORDEN LADNER GERVAIS LLP
1200 WATERFRONT CENTRE200 BURRARD STREETP.O. BOX 48600VANCOUVER
BRITISH COLUMBIA
CA
V7X1T2
Trademark usage description
digital media and materials, namely, downloadable images and audio files and video files containing children's and adult artwork memes, artwork, tradi Read MoreVienna Information
3 . 7 . 16
Birds in flight or with outspread wingsOiseaux en vol ou à ailes largement déployées
3 . 7 . 17
Wings, stylized or not -- Notes: (a) Including wings constituting a symbol or an emblem. -- (b) Not including wheels or wheel segments with wings (15.7.17), staves with wings (24.11.3) and Mercury's helmet (with wings) (24.11.14).Ailes, stylisées ou non -- Notes: (a) Y compris les ailes constituant un symbole ou un emblème. -- (b) Non compris les roues ou segments de roues ailés (15.7.17), les bâtons avec ailes (24.11.3) et le casque ailé de Mercure (24.11.14).
3 . 7 . 21
Other birdsAutres oiseaux
3 . 7 . 24
Birds or bats stylized, in shadow or in silhouetteOiseaux ou chauves-souris stylisés, en ombre ou en silhouette
26 . 3 . 23
Lines or bands forming an angle -- Note: Including chevrons and arrowheads formed by lines or bands.Lignes ou bandes formant un angle -- Note: Y compris les chevrons et les pointes de flèches formées par des lignes ou des bandes.
26 . 13 . 1
Stains, spots, blots, brush strokesTaches, coups de pinceau
11
11
11
2169561
Trademark
Action Taken | Status |
---|---|
Submitted for opposition 26 on 20th Jan 2025 | Approved |
Submitted for opposition 27 on 20th Jan 2025 | Approval Notice Sent |
Submitted for opposition 15 on 7th May 2024 | Correspondence Created |
Submitted for opposition 15 on 26th Feb 2024 | Correspondence Created |
Submitted for opposition 22 on 12th Sept 2023 | Search Recorded |
Submitted for opposition 20 on 12th Sept 2023 | Examiner's First Report |
Submitted for opposition 287 on 15th Jul 2022 | Pre-Assessment Letter Sent |
Submitted for opposition 30 on 1st Mar 2022 | Filed |
Submitted for opposition 1 on 1st Mar 2022 | Created |
Submitted for opposition 31 on 1st Mar 2022 | Formalized |