Trademarkia Logo

Canada

C$
ECOFLOW
FORMALIZED

on 21 Sept 2023

Last Applicant/ Owned by

ECOFLOW INC.

Plant A202, Founder Technology Industrial ParkShiyan Sub-district, Bao'an DistrictShenzhen, Guangdong, 518000

CN

Serial Number

2282563 filed on 21st Sept 2023

Correspondent Address

NEOMARK LTD.

7450 rue Saint-HubertMontréal

QUEBEC

CA

H2R2N3

ECOFLOW

Trademark usage description

electric wires and cables; electric current collectors; ac/dc inverters; inverters for power supply; photovoltaic inverters; electrical charge control Read More

Vienna Information


26 . 11 . 8

Horizontal lines or bandsLignes ou bandes horizontales

26 . 11 . 3

More than two lines or two bandsPlus de deux lignes ou de deux bandes

26 . 11 . 10

Straight lines or bandsLignes ou bandes droites

Classification Information


Class [009]
Electric wires and cables; Electric current collectors; AC/DC inverters; Inverters for power supply; Photovoltaic inverters; Electrical charge controllers; Power switches; Electric relays; Electric sockets; Rheostats; Display monitors; Remote control receivers; Remote control transmitters; Current rectifiers; Electricity distribution consoles; Electric batteries for powering electric vehicles; Accumulators being electrical storage batteries; Wireless charging pads for smartphones; Charging stations for electric vehicles; Rechargeable electric storage batteries; Photovoltaic cells; Solar batteries; Solar panels for the production of electricity; Lithium ion batteries; Electric transformers; Electrical distribution boxes; Computer software for monitoring, optimizing and regulating the storage, transmission, and discharge of energy to and from electric battery systems; Electric battery systems and equipment for use in the storage, supply, transmission, and stabilization of electricity supplied by or to an electric power grid or other source of electric power generation.


Classification kind code

12

Mark Details


Serial Number

2282563

Mark Type

Trademark

Legal History


Action TakenStatus
Submitted for opposition 287
on 5th Oct 2023
Pre-Assessment Letter Sent
Submitted for opposition 30
on 21st Sept 2023
Filed
Submitted for opposition 1
on 21st Sept 2023
Created
Submitted for opposition 31
on 21st Sept 2023
Formalized