on 16 Jan 2019
Last Applicant/ Owned by
SHANGHAI HUGONG ELECTRIC (GROUP) CO. LTD.
7177 WAIQINGSONG HWY, QINGPU DISTRICT, 201700, SHANGHAI
CN
Serial Number
1830399 filed on 31st Mar 2017
Registration Number
TMA1013091 registered on 16th Jan 2019
Registration expiry Date
16th Jan 2034Trademark usage description
internal combustion engines for boats; internal combustion engines for land vehicles; internal combustion engines for motor vehicles; diesel engines f Read MoreVienna Information
26 . 11 . 1
One line or one bandUne ligne ou une bande
26 . 11 . 12
Curved lines or bands (except a 26.11.13)Lignes ou bandes courbes (excepté a 26.11.13)
25 . 5 . 3
Backgrounds divided into two, diagonallyFonds partagés en deux en oblique
26 . 4 . 1
SquaresCarrés
26 . 4 . 5
One quadrilateralUn quadrilatère
26 . 4 . 12
Quadrilaterals containing one or more other geometrical figures -- Note: Including quadrilaterals containing bent or straight lines (except 26.4.11).Quadrilatères contenant une ou plusieurs autres figures géométriques -- Note: Y compris les quadrilatères contenant des lignes courbées ou droites (excepté 26.4.11).
26 . 4 . 18
Quadrilaterals containing one or more lettersQuadrilatères contenant une ou plusieurs lettres
26 . 4 . 24
Quadrilaterals with dark surfaces or parts of surfacesQuadrilatères avec surface ou partie de la surface foncée
26 . 3 . 1
One triangleUn triangle
26 . 3 . 6
Triangular figures with one or more convex or concave sidesFigures triangulaires à un ou plusieurs côtés convexes ou concaves
26 . 4 . 26
Quadrilaterals with cutout areasQuadrilatères avec des zones découpées
11
CIPO Classification Code
Nice
1830399
Trademark
Action Taken | Status |
---|---|
Submitted for opposition 55 on 16th Jan 2019 | Registered |
Submitted for opposition 50 on 17th Aug 2018 | Allowed |
Submitted for opposition 51 on 17th Aug 2018 | Allowance Notice Sent |
Submitted for opposition 42 on 2th May 2018 | Advertised |
Submitted for opposition 26 on 26th Apr 2018 | Approved |
Submitted for opposition 22 on 6th Mar 2018 | Search Recorded |
Submitted for opposition 27 on 6th Mar 2018 | Approval Notice Sent |
Submitted for opposition 31 on 6th Apr 2017 | Formalized |
Submitted for opposition 30 on 31st Mar 2017 | Filed |
Submitted for opposition 1 on 31st Mar 2017 | Created |