on 17 Jan 2023
Last Applicant/ Owned by
SHANDONG WELLTEK PETROLEUM EQUIPMENT CO. LTD.
No. 618 Yulan Road Qufu High-Tech Development Zone (Lingcheng)Shandong
CN
Serial Number
1941230 filed on 17th Jan 2019
Correspondent Address
GOWLING WLG (CANADA) LLP
550 BURRARD STREETSUITE 2300VANCOUVER
BRITISH COLUMBIA
CA
V6C2B5
Trademark usage description
air sterilisers, air deodorizing apparatus, gas scrubbers, ventilating fans, air conditioning units; air and water ionizers, air filtering units for r Read MoreVienna Information
7 . 1 . 6
Towers or masts, derricks (except 7.1.16) -- Notes: (a) Including transmitting masts. -- (b) Not including Eiffel Tower (7.5.2).Tours, derricks (excepté 7.1.16) -- Notes: (a) Y compris les tours-émetteurs. -- (b) Non compris la tour Eiffel (7.5.2).
15 . 1 . 25
Various other mechanical appliances -- Notes: (a) Including door closers. -- (b) Not including power drills and pneumatic hammers (14.7.6).Autres appareils mécaniques divers -- Notes: (a) Y compris les ferme-porte. -- (b) Non compris les perceuses à moteur et les marteaux pneumatiques (14.7.6).
14 . 7 . 1
Hammers, sledge-hammers, malletsMarteaux, masses, maillets
14 . 9 . 7
Scythes, sicklesFaux, faucilles
24 . 11 . 18
Signs, drawings or other figurative elements recognized as emblems or insigniaSignes, dessins ou autres éléments figuratifs reconnus en tant qu'emblèmes ou insignes
1 . 7 . 6
Crescent moon, half-moonCroissant, demi-lune
1 . 7 . 11
Crescent or half-moon with manufactured articles or industrial productsCroissant ou demi-lune avec objets manufacturés ou industriels
15 . 1 . 1
Machines for industry and industrial installations (such as for pressing, grinding, mixing, distilling or excavating, including millstones)Machines pour l'industrie et installations industrielles (par exemple à presser, broyer, mélanger, distiller ou creuser, y compris les meules de moulins)
27 . 5 . 1
Letters presenting a special form of writingLettres présentant un graphisme spécial
27 . 5 . 21
One letterUne lettre
11
11
11
11
1941230
Trademark
Action Taken | Status |
---|---|
Submitted for opposition 6 on 17th Jan 2023 | Abandoned - Section 36 |
Submitted for opposition 14 on 25th Oct 2022 | Default Notice Sent |
Submitted for opposition 22 on 7th Apr 2022 | Search Recorded |
Submitted for opposition 20 on 7th Apr 2022 | Examiner's First Report |
Submitted for opposition 31 on 21st Jan 2019 | Formalized |
Submitted for opposition 1 on 18th Jan 2019 | Created |
Submitted for opposition 30 on 17th Jan 2019 | Filed |